CDM-710 Broadcast Satellite Modem Revision 11
Installation MN/CDM710.IOM
2–2
2.2 Mounting
If the CDM-710 is to be mounted in a rack, ensure that there is adequate clearance for ventilation,
particularly at the sides. In rack system where there is high heat dissipation, forced air-cooling
must be provided by top or bottom mounted fans or blowers. Under no circumstances should the
highest internal rack temperature be allowed to exceed 50°C (122°F).
2.2.1 Method A: Optional Rear-Mounting Support Brackets
Figure 2-1 depicts rack-mounting using the optional CEFD P/N KT/6228-2 Rear-Mounting
Support Brackets kit:
Optional Rear-Mounting Support Brackets Kit KT/6228-2
Quantity CEFD Part Number Description
2 HW/10-32SHLDR Screw, #10 Shoulder
4 HW/10-32FLT Washer, #10 Flat
2 HW/10-32SPLIT Washer, #10 Split
2 HW/10-32HEXNUT Nut, #10 Hex
2 FP/6138-1 Bracket, Rear Support
4 HW/10-32x1/2RK Bolt, #10 Rack Bracket
The tools required for this installation are a medium Phillips screwdriver and a 5/32-inch
SAE Allen Wrench. The kit is installed as follows:
Step Description
1
Secure the #10 shoulder screws to the unit chassis through the rear right and left
side mounting slots, using the #10 flat washers, #10 split washers, and #10 hex
nuts as shown.
2
Install the rear support brackets onto the equipment rack threaded rear mounting
rails, using the #10 rack bracket bolts.
3
Mount the unit into the equipment rack, ensuring that the shoulders of the #10
shoulder screws properly engage into the rear support bracket slots.